Metro Master Plan

The Metro Master Plan network takes into consideration the future growth of Panama City’s metropolitan area. The system will be composed of four lines, and a tram that will travel from Cinta Costera to Casco Viejo.

This master plan was presented in the initial demand study for tendering Line 1. This network is projected to be fully operational by 2035.

The next line to be tendered will be Line 2, which will begin at La Doña and end at San Miguelito, making this station a transfer point between Line 1 and 2.